What this rule means

In calendar.txt, each service_id states the days of the week it runs (monday to sunday, 1 or 0) between start_date and end_date. The rule fires when a row of calendar.txt has all seven days set to 0: by its days of the week, the service never runs.

For this rule the validator reads calendar.txt alone. It reports the row even when calendar_dates.txt adds dates to the service (exception_type = 1).

Severity: warning.

Why it matters

A warning does not block a delivery in GTFS Express. But if no date is added to the service in calendar_dates.txt, every trip in trips.txt carrying that service_id disappears from the published timetable. And if the service lives by its dates only, its row in calendar.txt adds nothing and leaves a doubt for whoever reads the file next.

Common causes

How to fix it

Decide whether the service should run. If it runs on some days of the week, set those days to 1 in calendar.txt. If it runs on given dates only, keep its dates in calendar_dates.txt and delete its row from calendar.txt: a service can exist by its dates alone. If it is no longer used, delete it together with the trips that use it (and their stop_times), or move those trips to a service that runs.

In GTFS Express, the validation report names the service_id concerned. "Fix one by one" opens its row of calendar.txt in the editor; each change is a retouche in the draft, and "Re-validate" runs the validator again.

Example

service_id,monday,tuesday,wednesday,thursday,friday,saturday,sunday,start_date,end_date
HOLIDAY,0,0,0,0,0,0,0,20260901,20270831

The HOLIDAY service runs on public holidays, which calendar_dates.txt gives:

service_id,date,exception_type
HOLIDAY,20261101,1
HOLIDAY,20261111,1
HOLIDAY,20261225,1

These dates are enough to define the service. Once the HOLIDAY row is deleted from calendar.txt, the warning goes and the service runs on the same dates.

See also the guide School holidays and public holidays in GTFS.